Tilly Mill Road Sidewalk Project
North Peachtree Road to Womack Road
The city plans to add pedestrian accommodations along the west side of Tilly Mill Road. The sidewalks will tie into the recently completed intersection improvements at Tilly Mill Road and N. Peachtree Road and continue north to Georgia Perimeter College. Once constructed a continuous sidewalk and bike lane will be in place between N. Peachtree Road and Womack Road.
A Public Information Open House was held on May 5, 2015 at Kingswood United Methodist Church. Links to the documents presented at this event, including the comment card, may be found on the right side of this webpage.
Alternate 2 - Sidewalks and Bike Lanes was selected as the preferred design.
Sidewalks (5 ft wide) will be added to the west side of Tilly Mill Road. Also, Tilly Mill Road will be widened (6-8 ft) to accommodate designated bicycle lanes (4 ft wide) on both sides of Tilly Mill Road between N. Peachtree Road and Womack Road.
Overhead utilities are currently being relocated by the utility companies to make room for the City's improvements. The utility relocation phase is expected to be completed in the summer of 2020 with the City's contractor beginning construction shorly thereafter. The sidewalk and final paving is projected to be completed in the spring of 2021.
Updates
Click this link to sign up for a periodic newsletter providing project updates.
Documents from PIOH (May 5, 2015)
Alternate 2 - Sidewalks with Bike Lanes
Contact
Public Works
678-382-6850
construction@dunwoodyga.gov